In April 2022 EBNER received an order for the planning and supply of a 1-stage evaporation crystallization plant for the production of crystalline special salt from an aqueous solution with a capacity of 5,000 t/year including a downstream separation unit. The energy required for evaporation is supplied by live steam.

The client is a producer of special chemicals and is based in Germany.

The planning took place in an existing building under very tight space conditions over several floors. 3D laser scanning was used to digitally record the precise layout of the plant, which ensured a high degree of planning reliability.

The contractually agreed schedule was implemented to the client’s satisfaction.